The Geranium Project (R&D) 08

This week was supposed to be when I moved the VR into the space. Best laid plans and all that. I still need to sort out the internet for the studio and that’s delayed me for a week at the least. Life has intervened in other ways as well so part of the week was spent on the phone to Virgin Media.

I did get to the studio on Monday, continuing to work on the drawings I started last week,

Large Hydrangea August

Large Hydrangea August

adding some green to the big piece and working into the centre with black pastel and fingers.

One of six drawings made on Monday and Wednesday last week

One of six drawings made on Monday and Wednesday last week

As an example this is the development of the one I posted last week, another one looks like this now…

small hydrangea

small hydrangea

After this I got waylaid by virgin and decided to work on the VR at home for Wednesday and Thursday.

VR installation test

VR installation test

The first test I made works some of the drawings into a model of the installation space. The next two try to work the same drawings into the garden as a whole.

VR garden test

VR garden test

The latest has better materials but I’m still working out the problems with importing scale, establishing movement etc., should all be resolvable but I want to get it into the right ballpark before I bring the experts in.

2nd VR garden test

2nd VR garden test

this image and the next best illustrate the issue with scale

2nd VR garden test

2nd VR garden test

After 3 days away from the studio I continued to work on the large drawing, and did some further work on the small ones, but my major effort was to stretch some more paper on my new drawing boards.

large hydrangea

large hydrangea

small hydrangea

small hydrangea

And the studio looks like this.

Studio mid August

Studio mid August

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.