The Geranium Project (R&D) 24

Another truncated week spent sorting out the space at the studio and organising the VR space at home.

The video shows how far I got on Wednesday with the installation, I’ve got until Thursday next to sort it out to a finished state.

I should be working on getting an exhibition together in a few days, instead of which I’m studying procrastination. Yesterday I spent time clearing the garden, today I cleaned off the yard and washed the car. I have at least four ictures to frame for the exhbition and hang next week, all the labelling to be done, and I still need to title the pieces. I’ve got two drawn gardens to put together and import to the VR that I need to be working and I’ve still got to work out the transitions between the gardens when I’m there. The projection needs to be resolved for the installation and I’ve should really change the video and work out the sound. Additionally I’ve not yet bottomed the PIR for the raining section of the installation. All this needs to be resolved in the next four days!

I’m rounding this post off with a few shots of the space as it stands today.

View of the Gallery

View of the Gallery

Progress of Drawings

Progress of Drawings

There are a combination of drawings and paintings which have informed the content of the installation and the VR world. The user should be able to recognise the paintings inside the VR space, how far that works remains to be seen.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.