NEW STUDIO – Week Two

This week has been about catching the installation back up to where I was at the Wheatley studio.

On Monday I had to finish building the space, which took the morning, and then thread the fishing line and hang the leaves, leaving me at this point by the end of the day.

From the video and the picture below you can see I had to build myself a rudimentary ladder to access the top of the boards.

Build your own ladder

Build your own ladder

On Wednesday I got notification that I’m almost official to move in. The agent says the forms should be across to Axisweb soon.

Shadow from projection, inside the space

Shadow from projection, inside the space

As you can see I got the ceiling on the space and set up the speakers and projector. The space presents some profound differences to the Industrial Unit, it’s a lot darker for instance.

This clearly presents problems with the painted space and the degree of visibility required to read its intention.

A view inside the space, lit by the projector

A view inside the space, lit by the projector

The video inevitably, for one as inexpert as me, appears darker than the eye. The photograph gives a better idea of the look of the space. By the end of the day this was the position.

So Friday was about finessing the space and continuing to tidy up downstairs.

Upstairs room with the installation in place

Upstairs room with the installation in place

Even darker with the roof stapled down and the webcam moved to give a better view of the door.

In the afternoon I spent two and a half hours hoovering the shop.

Shop floor view from the window

Shop floor view from the window

It looks much more acceptable now, although I wouldn’t be happy with it if I lived there.

Shop floor view towards the window

Shop floor view towards the window

At the moment I’m thinking of a workshop space at the back and an exhibition space at the front.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.