Studio Build TEN

Week Nine in the studio.

Effectively the last week.

I received the ceiling material for the installation so before I started to pack up I installed that and ran a quick test.

projector wall view

projector wall view

The change in lighting works, but it obviously takes some time for your eyes to adjust.

projector wall view

projector wall view

It does enough to give the sense of space from close up, and once the focus is correct the image is sharp enough. It is seen better in the video.

The video shows that my order for black muslin was delivered short by over a metre which is a bit of a bugger but I had enough to try it out. At the end of the video I deliberately step in front of the project lens to cast shadow, my intention is to add some texts that can only be read when in shadow, a different texture of white perhaps? The audio is still a test piece.

After this test I had to start dismantling the space, by the end of Monday I’d reached this state.

half environment

half environment

partly dismantled stuff

partly dismantled stuff

Then back on Wednesday to complete the breakdown.

The Unit is back in the state it was when I moved in and all I need now is to find another studio and move everything. I’ve got sixteen days to go but I’m seeing another space tomorrow.

Studio Build EIGHT

Week Seven in the Studio

Back to it after XMAS. Took the computer and speakers to the studio.

computer in situ

computer in situ

Arrived just before 12 and built a shelf to install the computer and speakers. Now the webcam acts as a Motion Sensor and turns a sound file on when you enter the space.

On Wednesday I had a visit from an Estate Agent and a guy measuring up for a Mezzanine Floor. It is likely that I’ll need to leave the studio in the next month! That’s the downside of the arrangement with Axisweb, 3 weeks notice to quit either way.

open sculpture

open sculpture

Worked on the open sculpture,

open sculpture view

open sculpture view

And the two part sculpture which will have a central section.

Recorded the above video with three speakers and no radio!

On Friday I brought the projector to the studio and worked out where I need to locate it to create shadows. I will need to put a ceiling in to reduce the amount of light in the space, not totally dark but reducing enough for the video to cast over the distance.

Continued work on the two sculptures,

quick now

‘Quick now, hear, now, always’

'Quick now, here, now, always'

‘Quick now, here, now, always’

'Quick now, here, now, always'

‘Quick now, here, now, always’

Which has some nice dramatic viewpoints.

And the as yet unnamed small sculpture.

unnamed small sculpture

unnamed small sculpture

Studio Build SIX

Week five in the studio:

Very mild this week but absolutely throwing it down, I arrived wet and my coat was still wet when I left in the afternoon. I’m writing another post on the Doncaster Art Fair that interrupted my building. Today I wanted to treat the leaves so they can retain colour and paint out more of the big drawing.

First I painted in the leaves in the big drawing with Indian ink, then I treated the leaves with PVA and then painted over the big drawing with more white. I only took photographs at the end for reference so these go around the space.

right wall one

right wall one

right wall two

right wall two

garden wall

garden wall

left wall one

left wall one

left wall two

left wall two

projection wall

projection wall

The very light wall taken down further to facilitate projection.

Wednesday started badly, it was chucking it down and the walk to the studio was very unpleasant. I didn’t really know where to start so I set up the light and put the heater on to dry my shoes.

first I turned the leaves which were dry on top but still wet underneath.

Then I dug out the sketch books and did some work on the garden sculptures.

These are sketches towards stand alone sculptures but also inform the look and feel of the space, particularly the right hand wall, opposite the projection wall.

I then cut the wood I prepared last week, or the week before, to build small sculptures exploring the garden in Balby.

The second picture taken with flash to emphasise how dark it was at that point.

I rounded the day off by painting the projection wall out more and resolving to purchase small stepladders.

Friday was a better day weather wise and therefore lighter.

The leaves were dry so I set out to put fishing line across the space and then hang sets of them.

fishing line as ceiling

fishing line as ceiling

Putting the line in and then stringing the leaves took me most of the day and I ended up with this

I did some work on the sketchbooks and thought about the effect I wanted for the leaves in the space, is it getting too busy?

I won’t be here next week so that will give me time to think about what I want from the space and also to work on the projection – in sketchbooks and mentally. I still need stepladders and I need to get the computer and webcams down to the site.